Skip to main content

HB 1142 (2024)

Require experience before retaking septic exams

Summary:

Requires a period of active engagement in the trade of septic system design before taking the exam to be a septic designer or installer. The House amended the bill to instead require individuals who do not pass the sewage or waste disposal system installer permit examination to demonstrate additional training in the trade of septic system installation to be eligible to take the examination again.

Bill Sponsor:
Mark E. McConkey
Republican party logo
Bill Became Law?:
No
Status:
SENATE
Status Detail:
Interim Study
Public Hearing Date:
04/25/2024 09:30 am
Public Hearing Location:
SH Room 103
House Voting Date:
03/07/2024
Senate Voting Date:
05/15/2024
Thank you to our sponsors and donors